Leave a Message

Thank you for your message. We will be in touch with you shortly.

Medina WA Teardown Rebuild Rules Buyers Should Know

September 3, 2026

A house going up at 3217 Evergreen Point Road, just north of the SR 520 interchange, sat on a lot of roughly 34,111 square feet. That is nearly four times the size of a typical suburban parcel. Neighbors still complained. The building was a large, flat-roofed rectangle with almost no architectural relief and little landscaping to break up its mass, and it sat close enough to the property lines that the people next door felt boxed in on their own land. By February 2026, Medina's Development Services Manager Steve Wilcox had a name for the pattern showing up across the city: the "Medina megabox."

Within weeks, the city council had rewritten the residential building code to stop it from happening again. If you are looking at a teardown or a large rebuild lot in Medina right now, that rewrite is not background noise. It is the reason the buildable envelope on the parcel you are evaluating may not be the one a listing photo, a neighbor's finished house, or last year's spec sheet would suggest.

Three Ordinances in Five Months

Medina's response came fast, and it is still moving.

Date Action What Changed
February 23, 2026 Council adopts Ordinance No. 1052 by a 5-1 vote Interim rules on setbacks, height, and landscaping take effect immediately, city-wide, for new permit applications
April 13-14, 2026 Public hearing held on Ordinance 1052 Residents and property owners testify; Planning Commission directed to begin work on permanent standards
July 27, 2026 Council adopts Ordinance No. 1059 Extends and further modifies the interim control while permanent code language is still being drafted

That last row is the one worth sitting with. As of this writing, Medina is still governed by an interim measure, not a finished ordinance. The Planning Commission has been directed to develop permanent regulations, but no permanent version has replaced the interim one. A buyer running numbers on a Medina rebuild today is pricing a moving target, not a settled rule set.

The House That Started It

City Attorney Jennifer Robertson, a former Bellevue councilmember, told the council the pressure had been building for a while, through the Comprehensive Plan update and through public comment on middle housing, well before the Evergreen Point project became the flashpoint. The complaint she summarized: homes built out to the maximum allowed by the zoning envelope were starting to loom over the neighbors on either side.

Deputy Mayor Randy Reeves was blunter about the specific house. He told colleagues the Evergreen Point project could not be allowed to happen again on the council's watch, and pushed for the amputation of the problem before it spread rather than a slower study of the whole code. Not every councilmember agreed with the pace. Councilmember Heija Nunn cast the lone dissenting vote, saying at the study session that she saw trouble ahead in trying to solve too many problems in one emergency ordinance rather than narrowing the scope first.

The vote passed 5-1 anyway, and the rules took effect the same day, city-wide, for any permit application filed after that point.

What Actually Changed in the Code

The interim ordinance touched four specific parts of the Medina Municipal Code:

  • Side yard setbacks increased under section 16.22.030, pushing new construction farther from property lines
  • New landscaping requirements under 16.22.040 for any part of a building that protrudes into a setback
  • The bonus height option eliminated entirely under 16.23.050 and 16.23.060, removing an administrative path that had let some homes build taller than the base standard
  • New lighting limits under 16.44.040 for vacant residences, restricting interior lights left on and exterior lighting that spills onto neighboring properties

None of these are cosmetic. The bonus height elimination alone changes what a two-story home with a view corridor can look like on a lot where the previous owner, or the seller's own architect, assumed that extra height was available. The setback increase changes where a building footprint can legally sit, which on Medina's smaller interior lots can mean redesigning a floor plan rather than adjusting it.

The Question That Matters More Than the Setback Number

Here is the detail that should change how you evaluate a Medina teardown lot before you write an offer. The ordinance was adopted as an Interim Official Control under RCW 35A.63.220 and RCW 36.70A.390, the state statutes that let a city impose emergency zoning changes ahead of a full public process. Both ordinances include language on vested rights, meaning the rules apply based on when a permit application is filed, not when the land was purchased, when a design was drawn, or when a prior owner secured an earlier permit that never got built.

That timing detail is the actual risk. A lot that supported a certain house under the old code may not support the same house under the interim one, and the only way to know is to check the permit application date against the ordinance's effective date, not to eyeball the parcel or compare it to the house next door. City staff themselves compared the interim control to a stop-work order: a signal that something needed to change immediately, with a re-issuance expected once the underlying problem is better understood. That is not a settled answer. It is a placeholder that has already been extended once, in July, and may be extended or rewritten again before the Planning Commission finishes its work on permanent standards.

If you are under contract or drafting an offer on a rebuild lot, the practical move is to confirm with the city's Development Services Department whether any permit application on the property predates February 23, 2026, and if not, whether your design assumptions account for the current setback and height rules rather than the ones that applied a year ago.

Why the City-Wide Median Won't Help You Here

Buyers doing due diligence often start with the headline number: what is Medina's median home price doing right now. In this market, that number will not tell you much, and the reason matters for how you should be spending your diligence time.

Over the three months ending May 2026, one major portal reported Medina's median sale price at $5.6 million, up 68.4 percent year over year, built on 10 homes sold that month. A different portal's June 2026 snapshot showed the median list price at $4.99 million, down 29 percent from the prior month and 28 percent from a year earlier. A third source's April 2026 data showed 31 homes for sale with a $6.28 million median listing price and 39 days on market. Three portals, three overlapping windows in the same year, three different directions.

This is not a data quality problem. It is what happens when a city of roughly 2,900 residents sells single digits to low double digits of homes in a typical month. A handful of high-value or low-value closings can swing a median by tens of percentage points without reflecting any real shift in the market. For a buyer evaluating a specific rebuild lot, the city-wide median is close to irrelevant. What matters is the parcel: its lot dimensions, its setback exposure under the current interim rules, whether it has water frontage or a view corridor, and whether any structure on it has an active or expired permit. Two lots with similar square footage can have completely different buildable outcomes right now, and no aggregate statistic will tell you which is which.

What This Means If You're Looking at a Teardown Lot

Before you build a pro forma around a Medina rebuild, a few checks are worth doing in this order:

  • Confirm with Medina's Development Services Department whether a permit application on the property has been filed, and if so, on what date, relative to the February 23, 2026 effective date of Ordinance No. 1052
  • Ask whether the parcel's design assumptions rely on the bonus height option that Ordinance 1052 eliminated
  • Review current side yard setback requirements under MMC 16.22.030 against your architect's site plan, not against a neighboring house that may have been permitted under the prior code
  • Track the Planning Commission's progress toward permanent standards, since the interim control has already been extended once and the final rules may differ from what is in effect today

None of this replaces a conversation with an architect or a land use attorney familiar with Medina's code. It does mean that a rebuild lot in this city is not a spec you can price from the street.

A Few Questions Worth Asking Directly

Does this affect homes I'm buying to live in as-is, not rebuild? No. The interim ordinance governs new construction and permit applications. A home you intend to occupy without new building permits is not subject to these setback, height, or landscaping changes.

Will the permanent rules end up stricter or looser than the interim ones? That has not been decided. The Planning Commission has been directed to study the issue and draft permanent standards, but as of the July 2026 extension, no permanent version has been adopted. Treat the interim rules as the current standard, not the final one.

Is this a Medina-specific situation, or does it happen elsewhere on the Eastside? Interim Official Controls are a standard tool under Washington state law that any city can use when it needs to act before finishing a full legislative process. Medina's use of one here, tied to a specific project and a specific public reaction, is a useful case study for why permit timing deserves scrutiny on any Eastside rebuild lot, not just this one.

If you are evaluating a teardown or rebuild opportunity in Medina, the parcel-level homework matters more than the headline market number. Chris Bierrum works through exactly this kind of diligence with buyers and sellers across Medina and the broader Eastside. Schedule a Consultation to talk through what a specific lot can and cannot support under the current code.

Work With Chris

I offer the highest level of expertise, service, and integrity. Connect now to get started today.